SAP Create Cost estimate Transaction Codes – Tcodesee | create
costing run – Tcodesee
Menu
Path Use the following menu path to begin this transaction:
Accounting®Controlling® Product Cost Controlling® Product Cost Planning ® Material Costing ® Cost Estimate with Quantity Structure® Create CK11N
Overview
we make a standard quote for a material toward the start of a financial year or another period. The standard quote stays coherent for the whole year or period. We may utilize it to set up a standard cost for materials for the spacific time span.
We should not altar the standard cost estimate during this time
period.
we value the planned quantity structure of a standard cost estimate with standard prices. A standard cost estimate for a material is not linked with an order
or production version.
Tcode CK11N Module Controlling Purpose Create
cost estimate Component
CO-PC |
When to start
At the start of the period to create the standard cost for the period
of the material
Step 2 Screen flow
when create costing run individual material then some fields must b fill in appear screen shot below mentioned
This field must be filled for create cost estimate
1 Material Number
2 Material Description
3 Plant Number
4 Costing Variant
5 Costing Version
and then click next screen on dates field cost estimate creation date
Prerequisites
we create a cost estimate based on a costing variant. for standard cost estimates, the costing variant contains the following settings:The costing type indicate that the costing results can be updated to the material master as the standard price.The valuation variant specifies that the materials are valuated at the standard price or planned price.
Creating a Costing Run - sapcoo