Complete allocation structure PM-TCodesee| Message no. KD503 complete allocation structure PM

 Message no. KD503 complete allocation structure PM

 Message no. KD503

Verification:

During settlement, the framework puts the sender charges into bunch (tasks), which are settled utilizing a similar settlement cost element.The settlement task is made in the portion structure, which is put away in the settlement rule for the sender (under settlement boundaries). Cost component 80000100 can't be appointed to a settlement cost task in designation structure PM, and in this way it can't be doled out to a settlement cost component.



Procedure

Possible solutions are as follows:

If the posting under cost component 80000100 was made to the sender as a result of an inaccurate section, and you can switch the posting, and don't have to refresh the portion structure. You just need to turn around the erroneously allocated posting prior to rehashing the settlement. Exemption: For a speculation measure with a detail settlement, you need to broaden the distribution structure, even after the inversion.


If the posting was made correctly, you can do the following:

     a)  You can assign a different allocation structure to the sender:

         In the master data maintenance for the sender, choose

         "Settlement rule -> Goto -> Settlement parameters" and then

         enter a different allocation structure.

Then settlement tcode run and no error in pm allocation structure 

In the event that vital, additionally check whether the right designation structure is entered in the settlement profile. The allotment structure is defaulted in the settlement profile when you make sender ace information or when you keep up the settlement rule. 


You can refresh distribution structure PM